View Single Post
Old 10-09-2011, 11:38 AM   #33
sailah OP
Lampin' it
 
sailah's Avatar
 
Joined: Aug 2005
Location: Turning expensive metal into scrap
Oddometer: 5,391
Got a few things done today. Finished the stem, got it pressed into the triple and added seals and bearings. Fits great, very smooth action no wobble. Happy to put that behind me. I need to get the bolts that attach the bar risers to the top and can have that mounted. You can see that I used the stock nut from the YZ to clamp down the top triple. So much easier when you can utilize what you have.





Waste not, want not. I used the old KTM stem to make a spacer for the middle of the swingarm. The swingarm bolt is 17mm, closest I had was 43/64" (It's nice to have every single drill bit...) so I drilled it out on the lathe and cut it to length.



I also made a couple for the outside of the swingarm to "space" it. I will probably make these from steel and weld them to the frame, but only after I make sure thats exactly where it needs to be.

Drilled the rivets out of the can, cut it down, relocated the tin and bob's yer uncle. I will repack it and obviously have to make a custom exhaust but I like how it looks. It will prob be really loud being that short. I might be able to make the other longer. This one was damaged and the carbon had split so that's where I cut it. I can go a little longer on the finished one.

__________________
We're not out here to rough it. We're here to smooth it . Things are rough enough in town.

Nessmuk
sailah is offline   Reply With Quote