View Single Post
Old 05-29-2012, 07:37 PM   #49
walkingbear OP
Beastly Adventurer
 
walkingbear's Avatar
 
Joined: Jun 2004
Location: Scottsdale AZ..
Oddometer: 3,378
Tues 5:30 AM

The first of the trucks rolled in. Pickup truck with the cement mixer towing behind.

First order of business was to dust the concrete floor with sand and stacking loads of cinder blocks inside the garage. Sand will catch any of the mortar that is dropped during the building of the walls.








The electricians showed up to place the boxes in place ( all the outlets will be 4 feet off the floor) We talked about the placement of the out door lights and we added another outlet in the middle of the garage door (motion detector )






The plumber showed up to back filled the ejector pump and run the sewer piping connect to the house. He also had to adjust the height of the water pipe leading to the garage .. he was a little short




The task today was to build the corners and have them inspected Wed afternoon after they are filled with slurry.




Had to go to hardware store to buy a box of snake shots. A little visitor to the site and it got under the pallets before I could hit it with a shovel.

I have a dog and 13 month old. Hate rattle snakes.......
__________________
BMWMOA 82741 ABC 8418
2wheeltraditions@gmail.com
75 R90S , 77 R100 RS,88 R100GS ,94 R1100RS (Aragorn) 2k 1150GS DMC sidecar,
Rosso Mandello V11 , 2014 R nine T

walkingbear screwed with this post 06-03-2012 at 04:36 PM
walkingbear is offline   Reply With Quote