flooring.. stair landing and walls
We added two window from the upstairs to look down into the garage.
Just a nice way to bring openness to the project.
The upstairs will be finished this afternoon. The landing has been built.
So, noon Friday the crane will be here to hoist the beam and roof trusses.
Forms fro the eaves on the second level
Dividing wall from the 2nd floor to the garage. We added the two windows.
Hand cut treads 7 3/4 rise 12 deep.
Landing, we added a closet to be built under the steps for storage (gun safe)
this little space under the stairway will be the safe secret hideaway for the kids.
__________________
BMWMOA 82741 ABC 8418 75 R90S ,83 R100 nake (Baron) , 88 R100GS ,94 R1100RS (Aragorn) 2k 1150GS DMC sidecar ,05 K1200S (Gandalf)
walkingbear screwed with this post 06-28-2012 at 02:12 PM
|