Monday morning .. getting ready

Clean up and meet with concrete contractor.

Painted the industrial shelving this morning. Need to let it dry for a day.
Painted the barn rail (14 feet x 3 inches 3/8 thick.

Cleaned the upstairs to show the wood ..

Carried all the doors ( shower, barn doors and medicine cabinet upstairs.

Brakes on the work ATV .. sprang a leak somewhere .. bleeding the brakes for a hour and still no pressure.. Maybe a MC time.

Found the open sign.. I'm open for visitors




upstairs cleaned up. Now the floor finishing will start after the doors are installed.


Ugly industrial shelving got a coat of oil base industrial paint.




Here are the commercial door that will be cut down and used as barn doors ( fire rated doors )


Visitors bench seats ( seats out of my Sprinter Van.)


Bronze paint for the barn rail.




I had 30 pieces of black rubber flooring that I had in another garage. It is great flooring .. allow you to stand a long time.

__________________
BMWMOA 82741 ABC 8418
2wheeltraditions@gmail.com
75 R90S , 77 R100 RS,88 R100GS ,94 R1100RS (Aragorn) 2k 1150GS DMC sidecar,
R nine T

walkingbear screwed with this post 10-08-2012 at 08:31 PM
walkingbear is online now   Reply With Quote