|
Thurs.. final steps toward the pour
Instead of doing sets of 7.5 risers and 11 inch steps .. we decide on doing longer pads . Some how it worked better with the slopes and fill we had left.
Decided on a color for the wood floor. Mimwas Goldern Pecan. Nice rich finish . Contractor is coming to give an est. to bead blast the pine floors with dry ice. Does leave marks ..just a very clean floor to stain.
After reading about safety with tall shelving ..decided to paint the first brackets RED.
The finish steps. The lazy electricial contractors who forgot to buried the low voltage lines and made a half as job in installing a tube. We had to dig up and re disigned the line so it wouldn't pop up during the concrete pour. 3 backs of Mortar later we had the line secured with big rocks
__________________
BMWMOA 82741 75 R90S ,83 R100RT (Baron) , 88 R100GS ,94 R1100RS (Aragorn) 2k 1150GS w/hack,05 K1200S (Gandalf)
walkingbear screwed with this post 10-11-2012 at 08:58 PM
|