View Single Post
Old 02-06-2013, 12:37 PM   #10
r1200gs_chris
Gnarly Adventurer
 
r1200gs_chris's Avatar
 
Joined: Feb 2011
Location: Brockville
Oddometer: 139
1st, skin the backside of the wall with plywood, 1/2" should do. Glue and screw (NO NAILS) the plywood to the studs. Go buy some construction adhesive. Don't be cheap with the screws, every 8-10 inches in each stud, run glue down all studs. 2nd, drill a few pilot holes and strew some 3"x1/2" lag bolts into the floor. The plywood will make the wall rigid, and the lag bolts will hold it to the floor. Most of the wiggle is coming from the fact that the nails are not keeping your joints tight. When you build the second wall fell free to put the construction adhesive between each joint for added strength.

Good luck!

r1200gs_chris screwed with this post 02-06-2013 at 12:41 PM Reason: Big fingers
r1200gs_chris is offline   Reply With Quote