|
Nope. The plan is to tape up and cover the two electrical contacts, the threads, and the switch assembly to keep the JB weld off of those areas, then bath the rest of the unit in a layer of JB, then remove the tape exposing the clean parts that were covered...
__________________
R100GS for going far, FZ1 for going fast, and TE250 for getting dirty
|