New Desert/Enduro Gas Tank for the SE950R

Discussion in 'Vendors' started by PowerCell, Aug 23, 2012.

  1. Yardstick

    Yardstick Hydrophobic

    Joined:
    Oct 18, 2007
    Oddometer:
    3,766
    Location:
    Chandler, Arizona
    Sounding like a major step in the right direction! :clap Are the side mounts changed from the SM tank then? If so, where do they attach?

    I like the look of that rubber isolated bar mount system. The regular system kind of bugs me since the stabilizer is mounted on the wrong side of the rubber isolation! :lol3
    #61
  2. PowerCell

    PowerCell Manufacture Super Supporter Supporter

    Joined:
    Sep 28, 2005
    Oddometer:
    2,734
    Location:
    Southern Kalifornia

    We use the same side mounts as the SM, which are approx 6" lower and 2" further forward than the SE side mounts. We also are including a custom stainless steel front mount that is significantly stronger than the stock SM front mount, and threaded to fit the SE.


    [​IMG]


    .
    #62
  3. Yardstick

    Yardstick Hydrophobic

    Joined:
    Oct 18, 2007
    Oddometer:
    3,766
    Location:
    Chandler, Arizona
    Gotcha! I thought you were talking about something even further forward, closer to the radiator itself. I get it! :thumb
    #63
  4. Splisken

    Splisken I'm not dead yet...

    Joined:
    Oct 13, 2011
    Oddometer:
    169
    Location:
    Fort Collins, Colorado
    Things are looking very good indeed! :clap The lines of the tank to seat are great and flow well. The shorter filler tower looks much better IMHO and as another said there would be no real loss in capacity there. Any new news? :ear

    Hey Ken - You mentioned reaching out to me before manufacturing mine to verify choices...if not too late I'd prefer the black (call me a poser if you will) as the graphics we are working on just don't work on the other colors as well IMHO. I can live with the orange if too late but would prefer the black at this point. :freaky
    #64
  5. snowhawk jockey

    snowhawk jockey Slack Jaw Gaper

    Joined:
    Jul 5, 2005
    Oddometer:
    1,652
    Location:
    The other Center of the Universe: Bend, Oregon
    Beautiful project!

    Love the lines of the design.

    Will it fit my 950SM?

    THX!!
    #65
  6. PowerCell

    PowerCell Manufacture Super Supporter Supporter

    Joined:
    Sep 28, 2005
    Oddometer:
    2,734
    Location:
    Southern Kalifornia

    No problem Poser... :lol3

    I'll still reach out to you prior to molding and confirm the black.


    .
    #66
  7. PowerCell

    PowerCell Manufacture Super Supporter Supporter

    Joined:
    Sep 28, 2005
    Oddometer:
    2,734
    Location:
    Southern Kalifornia

    Yes it will...


    .
    #67
  8. dzrtracin

    dzrtracin возьми

    Joined:
    Sep 28, 2004
    Oddometer:
    4,937
    Location:
    the garage
    Ken, less than 2 weeks out?

    RIDE ON!
    #68
  9. snowhawk jockey

    snowhawk jockey Slack Jaw Gaper

    Joined:
    Jul 5, 2005
    Oddometer:
    1,652
    Location:
    The other Center of the Universe: Bend, Oregon

    I am a happy camper!! Gonna start a savings pile for one! Do you mind if I cross market the tank on the 950SM chronicles?
    #69
  10. PowerCell

    PowerCell Manufacture Super Supporter Supporter

    Joined:
    Sep 28, 2005
    Oddometer:
    2,734
    Location:
    Southern Kalifornia

    Sure... go forth and multiply... :thumb


    .
    #70
  11. Dan950ser

    Dan950ser Two Wheeled Addict

    Joined:
    Sep 24, 2010
    Oddometer:
    2,550
    Location:
    Olympia, WA
    So how's production going? Still on schedule for end of October/beginning of November? So excited. Thanks.
    #71
  12. PowerCell

    PowerCell Manufacture Super Supporter Supporter

    Joined:
    Sep 28, 2005
    Oddometer:
    2,734
    Location:
    Southern Kalifornia

    Well, as it stands we're running about two weeks behind. As you've seen in the latest pix, we've made quite a few small changes to the tank, and I think all will agree it's even better than before. I'm pretty pumped with the improvements and they're easily worth the short delay. We'll be at the foundry his week and from there the machine shop will install the tooling for the fuel filler and all the nutserts.

    On another note, I've been working with Chip Munn to source all the OEM KTM mounting hardware. We've got everything in stock with the exception of the lower tank mounts. KTM has them back ordered until the end of November. I've reached out to all the larger parts supply houses looking for some inventory, but no luck. I'll keep on it and let you guys know if I find another source for these parts.



    .
    #72
  13. Yardstick

    Yardstick Hydrophobic

    Joined:
    Oct 18, 2007
    Oddometer:
    3,766
    Location:
    Chandler, Arizona
    I've been thinking about how and where to install quick disconnects near the petcocks for quicker/easier removal and install of the tank, but I might have thought of a better way. Better until someone gets in gear and starts making the CPC connector PowerCell showed earlier in the thread that replaces the petcocks entirely, that is!

    We need to extend the crossover line anyway. How about cutting the longer part of the crossover line, to the right of the Tee that goes to the fuel pump, and then installing a double-shutoff CPC connector there? You would have to fish the right side line in front of the front cylinder, but it would mean you only have to deal with two quick disconnects to install/remove the tank. One on the crossover line and one to the carbs. You wouldn't have to remove the line from the Tee to the fuel pump each time. The fuel pump and crossover system would come off with the tank.

    The only things I'm not sure about with this configuration are:

    1. How hard would it be to fish that line through each time?
    2. Would a double-shutoff CPC connector flow enough to keep up with the demands of the pump/carbs/engine?
    #73
  14. PowerCell

    PowerCell Manufacture Super Supporter Supporter

    Joined:
    Sep 28, 2005
    Oddometer:
    2,734
    Location:
    Southern Kalifornia
    I never liked the crossover in the first place. I recomend dumping it and running both sides to a Y connector in the valley between the carbs. The fuel pump can lift the fuel the few inches needed.



    As a side note, I'm actually getting ready to do a first run build of my quick release connectors. I've worked things out with Colder Products on sourcing the needed parts and our first build will be 100 sets. No price or delivery date just yet...


    [​IMG]

    .
    #74
  15. Splisken

    Splisken I'm not dead yet...

    Joined:
    Oct 13, 2011
    Oddometer:
    169
    Location:
    Fort Collins, Colorado
    Count me in on the quick disconnects when you do get that far...#1 in!
    #75
  16. Yardstick

    Yardstick Hydrophobic

    Joined:
    Oct 18, 2007
    Oddometer:
    3,766
    Location:
    Chandler, Arizona
    #2!

    So is the female part here a standard CPC part threaded into a flange, or is the whole part custom with some CPC internal components and button?
    #76
  17. LoFlow

    LoFlow Long timer Supporter

    Joined:
    Feb 17, 2005
    Oddometer:
    1,035
    Location:
    Kitsap
    I've always wanted to get rid of the crossover but I didn't think I could still utilize all of the available fuel. Thanks for this info. And I'm also in for some disconnects when they become available.
    #77
  18. PowerCell

    PowerCell Manufacture Super Supporter Supporter

    Joined:
    Sep 28, 2005
    Oddometer:
    2,734
    Location:
    Southern Kalifornia
    We're making a new CNC machined hard anodized aluminum housing that will feature CPC internals.


    .
    #78
  19. Yardstick

    Yardstick Hydrophobic

    Joined:
    Oct 18, 2007
    Oddometer:
    3,766
    Location:
    Chandler, Arizona
    Those are some tiny channels for aluminum, aren't they? Need me to bust out some FEA tools? :lol3
    #79
  20. dzrtracin

    dzrtracin возьми

    Joined:
    Sep 28, 2004
    Oddometer:
    4,937
    Location:
    the garage
    Send paypal invoice when there ready ken. Thanks
    #80