ADVrider

Go Back   ADVrider > Gear > The Garage
User Name
Password
Register Inmates Photos Site Rules Search Today's Posts Mark Forums Read

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 09-24-2012, 03:06 PM   #11
walkingbear OP
Beastly Adventurer
 
walkingbear's Avatar
 
Joined: Jun 2004
Location: Scottsdale AZ..
Oddometer: 3,378
Monday Sept 24

Monday involved putting down the rubber floor mats in (under the guest room)
One of the lifts will be stationed there near the windows.

The other part of the day involved building a lift . My little one wants to put his car on top of my lift .. so I built him a wood one. Ramps were made and top will be added this evening .

Grading will happen tuesday morning. The last dumpster pull will be on Wed.
Painter is sealing the exterior walls Wed morning and painting Thursday

Moving is a pain in the ass.. but the more that is done the better the results for getting things put away .. plus getting my tool boxes in will be a plus.
__________________
BMWMOA 82741 ABC 8418
2wheeltraditions@gmail.com
75 R90S , 77 R100 RS,88 R100GS ,94 R1100RS (Aragorn) 2k 1150GS DMC sidecar,
Rosso Mandello V11 , 2014 R nine T
walkingbear is offline   Reply With Quote
 

Share

Thread Tools Search this Thread
Search this Thread:

.
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


Times are GMT -7.   It's 03:17 AM.


Powered by vBulletin® Version 3.8.5
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Copyright ADVrider 2011-2014